Lesson 6 of 6

Costs and thresholds

5 min Company administrator Updated
Objective

Base savings on your real costs, and alerts on your own thresholds.

Your costs

As long as you set none, Naoshift calculates its savings on reference values, which are neither yours nor a supplier’s price list. The Savings and Recommendations pages always say which base they count on.

  1. Open Settings › Analysis › Costs.
  2. Enter what you know, and leave the rest empty.
  3. Click Save. The change applies to the next calculation.
Cost It prices
vCPU, per month Right-sizing, idle machines
Memory, per GB and per month Right-sizing, idle machines
Storage, per GB and per month Space reclaim, snapshots, powered-off machines
Energy, per kWh Consolidation: the energy of a removed host
Licensing, per core and per year Consolidation: the licenses freed
Hardware maintenance, per host and per year Consolidation: the maintenance saved

An empty field takes the value of the parent company if there is one, otherwise the reference value. The screen says where each value comes from.

Your thresholds

Alert rules have default thresholds. You can adapt them to your company.

  1. Open Settings › Analysis › Alert thresholds.
  2. On a rule, enter the warning and critical thresholds, then save.
  3. Add an exception for an asset: 90/95% on a very large datastore, for example.

Emptying both fields of a rule brings it back to the defaults.

Before raising a threshold, ask whether the alert is wrong. For an asset that is out of scope, an exclusion with a reason is more accurate: it can be seen, and it can have an end date.

If you get stuck

The amounts have not moved

The change applies to the next calculation. Reload the Savings page, and check the base cited at the bottom of the page.

I do not know all my costs

Leave empty the ones you do not know. An approximate but assumed figure is better than one nobody can defend.

Go further

Try it on your estate

Naoshift Core, 30-day free trial. No credit card, no commitment.

Start my free trial